Off-Grid Solar Systems

Off-Grid Solar Systems 

Solar off-grid systems are installed on stand alone basis without any support from utility grid. They use batteries as storage devices of electricity that gets charged during the day and meets electricity needs during night. This way these systems ensure a 24 hour power supply.

Cellspan follows a systematic process for Project Execution:

Load Assessment

Load Assessment for light loads and heavy loads of the building or industry in order to calculate the system capacity required.

Prefeasibility Study

Prefeasibility Study of the available area to analyze system capacity possible and testing structure and climatic parameters for stability to support the module load, shading and grid accessibility connectivity.

Vendor Finalization

Vendor Finalization for equipments required all through the project along with qualified civil and electrical contractors.

Project Planning

Project Planning including preparation of detailed engineering drawings, project execution plant, system sizing and plant lay out.

Delivery of Equipment

Delivery of Equipment to project site after comprehensive testing done based on random sampling to ensure quality and consistency.

Installation and Commissioning

Installation and Commissioning of the plant's mounting structure, modules and other electrical equipment. This also covers the deployment of necessary monitoring system. Conduct